Put in the Coir Matting from the trench. Spot at the very least 12 inches of your roll higher than the trench (further up the slope). Place Each and every staple about a foot apart inside the trench Positioning: Location the coir logs for the waterline or together the sting https://andersonjofds.activosblog.com/32956093/a-simple-key-for-coir-door-mats-unveiled