(two) Failure to adjust to R&I plan needs may end in a violation of a number of of The premise for sanction at § 422.752(a). (three) The reward and incentive system is assessed as being a non-gain expenditure within the system bid. (i) If providing a reward and incentive method, https://carsonv680zzx1.evawiki.com/user