We labored carefully Along with the contractor to develop techniques to hurry up the ask for for details and shop drawing submittals. We had several submittals for foundation, lateral procedure and full construction doc to assist the contractor satisfy the project schedule. 565,000 sq ft Drawing from a 1923 program http://simonqhrah.imblogs.net/12283167/the-5-second-trick-for-composite-decking-atherton